Geothermal steam measurement systems

Venturi flow metering solutions with PLR compensation for steam applications

  • Stable measurement of sub-saturated geothermal steam
  • Continuous real-time flow measurement with steam quality indication
  • Seamless integration with new or existing systems
  • Low maintenance requirements

Geothermal steam measurement systems

Venturi flow metering solutions with PLR compensation for steam applications

  • Stable measurement of sub-saturated geothermal steam
  • Continuous real-time flow measurement with steam quality indication
  • Seamless integration with new or existing systems
  • Low maintenance requirements

Overview

A reliable measurement of both steam quantity and quality is a major challenge for all geothermal power plants. As the steam is close to saturation or even wet, small deviations in the operating conditions or unrecognized process disturbances could cause condensation or liquid carry-over. Any incorrect measurement affects the plant control and jeopardize the lifetime of the turbine-blades.

The KROHNE geothermal steam measurement system is an evolution of the WGS-series Venturi-based wetgas systems, field proven in the Oil & Gas Industry. The system consists of a 6D extended Venturi tube with heated annular chambers, and a Virtual Flow Computer (VFC) for liquid over-reading correlation and monitoring of the Pressure Loss Ratio (PLR) which indicates a shift in the liquid content.

The system fully complies with International Standards and combines a field proven Venturi flowmeter design with a virtual flow computer by KROHNE to accurately measure both the steam flowrate and condition. The system enables close monitoring and alarming of possible liquid carry-over without the need for additional on-line steam quality analysers.

  • Real-time measurement with steam wetness indication enables real-time process control
  • Measurement range; GVF > 90% or Lockhart Martinelli X < 0.3
  • Standard sizes available from 2 … 48” (50 … 1200 mm), larger sizes available on request
  • Pressure rating available in accordance to relevant standards
  • NACE MR 0175 compliant and suitable for NGC’s and TDS’s
  • Minimal permanent pressure loss
  • Continuous online monitoring of PLR enables immediate safety measures in case of process issues, and enables turbine safeguarding
  • Allows accurate monitoring of the complete dehydration process (separator, demister, condensate traps)
  • Provides trending, alarm management, reporting and integration with plant management and control systems
  • Extended Diagnostics

Related products

SUMMIT 8800

Flow computer for custody transfer (CT) measurement

  • Cost effective solution due to modular hard- and software design
  • Full colour graphical touch screen for maximum process transparency
  • Easy operator access enabling time efficient maintenance
  • Automatic Performance Monitoring extends recalibration interval

OPTIBAR DP 7060

Differential pressure transmitter for flow, level, differential pressure, density and interface measurements

  • High performance DP transmitter with integrated line pressure measurement
  • Measuring range: 30 mbar…16bar / 0.44…232 psi; Line pressure: up to 700 bar / 10,153 psi
  • Reference accuracy of ±0.065%
  • 2-wire, 4…20 mA/HART®, FF, Profibus-PA, Bluetooth®

Venturi tube

Engineered primary element for DP flow measurement of liquids, gases and steam with the lowest residual pressure loss

  • Machined or welded design (internally machined) according to EN ISO 5167, ASME MFC3
  • Lowest residual pressure loss of all DP elements
  • Only short inlet/outlet runs required
  • From basic to special wet gas applications and high pressure conditions

OPTITEMP TRA-TF56

Resistance (RTD) temperature assembly for higher flow velocities and pressures

  • Flange connection
  • ASME-style, barstock thermowell with tapered tip
  • -40…+600°C / +1100°F

Related solutions

Supervisory control cabinets

Complete solution for process control

  • Provides control of the metering system, including validation of field instrumentation
  • Installed in a safe area, typically in a control room or dedicated building
  • Supplied in combination with new metering systems, or for an upgrade to existing systems
Email
Contact